Huron Middle School
.

Lane 8 just ends ino the train just past the offset finish line.



There obviously was a previous imperial, paved track (with the old lines still
visible. They used the old track for a subsurface and shortened the south turn
to convert the distance.






Yes there is a real concrete curb.